Various Notice of Award

 

 

 

 

 

 

N-E-09-2012

2/22/12

CHES Enterprises Inc.

Lot 1 to furnish labor, fuel, equipment for the following activities stated below, by lot, for the project “Construction of Protection Dike/River Control along OcoyRiver (Sibulan)”

6,408,000.00

N-E-09-2012

2/22/12

MT.BINAI

Lot 3 for Dredging at interment section (using 1 unit surplus backhoe and other necessary tools) for a total volume of 15,223 cu.m. (width 30-50m, depth: 1-2m, length: 253.72 l.m.

2,463,500.00

N-E-09-2012

2/22/12

LEGAZPI Premium Dev’t. Corp.

Lot 4 for Embankment at intermitted section (using 2 units Brand New Backhoe and other necessary tools) for a total volume of 7,072 cu.m.

1,970,500.00

N-E-10-2012

1/19/12

Bigfoot Construction & Supply

Lot 1  to Furnish labor, fuel, oil and equipment in the “Rehabilitation along Ocoy River” for dredging at interment section of Ocoy River (using 3 units Surplus Backhoe with 0.9-1.2 cubic meter cylinder bucket and other necessary tools) for a total volume of 48,300 cu.m. with (depth:1m-2m, width:30m-50m and approximate length of 805 l.m.) for duration of 54 calendar days

3,761,963.51

 

 

 

(Note: This Award is a correction of Project Title of the previous posting dated August 22, 2012 reflecting the same Reference No. N-E-10-2012 with the same Contract Awardee – “Bigfoot Construction & Supply”)

 

N-E-11-2012

1/19/12

LEGAZPI Premium Dev’t. Corp.

Lot 1 to Furnish labor, fuel, oil and equipment in the “Rehabilitation along Banica River” for dredging at interment section of Banica River (using 2 units Brand New Backhoe with 0.9-1.2 cu.m. cylinder bucket and other necessary tools) for a total volume of 37,800 cu.m. with (depth: 1m-2m, width:30m-50, and approximate length of 630.00 l.m.) for a duaration of 63 calendar days  

2,957,133.00

 

 

 

(Note: This Award is a correction of Project Title of the previous posting dated August 22, 2012 reflecting the same Reference No. N-E-11-2012 with the same Contract Awardee – “Legazpi Premium Dev’t. Corp.”)

 

N-E-13-2012

2/14/12

UY CONDEV

Lot 1 to Furnish labor, fuel, oil, and equipment in the “Restoration of Provincial and Barangay roads damaged by the February 6, 2012 Earthquake” for the removal of landslides and other obstruction along the Provincial and Barangay roads Jimalalud using 1 unit Bulldozer and other necessary tools, for a volume of P13,275 cu.m. for a duration of 22 calendar days  

1,062,000.00

N-E-12-2012

2/14/12

CHES Enterprises Inc.

Lot 1 to Furnish labor, fuel, oil and equipment in the “Restoration of Provincial Roads damaged by the February 6, 2012 Earthquake” for the removal of landslides and other obstruction along the Provincial Roads and Barangay roads Bindoy using 1 unit Bulldozer and other necessary tools, for a total volume of 13,275 cu.m. for a duration of 22 calendar days

1,062,000.00