SUPPLEMENTAL/BID BULLETIN

Addendum No. 2

 

This Bid Bulletin is issued to inform prospective Bidders of some changes and/or modifications introduced by the Bids and Awards Committee for the requirements “Purchase of One (1) unit 6×6 Mobile Operations Center to be used for Emergency Response, Capability Enhance as well as other DRRM related activities, PDRRMC, Province of Negros Oriental” under Bid No. B-145-2024, ABC:P10,000,000.00, viz:

 

Amendments in the Technical Specifications:

Change from: Change to:
Kerb weight:  17110

 

Kerb weight15,000 Kg
Steering: ZF8118, German hydraulic steering with power assistance

 

Steering: Hydraulic steering with power assistance
Front axle: STR, steel front steering drive axle with planetary wheel reduction

 

Front axle: Steel front steering drive axle with planetary wheel reduction
Drive axle: ST16 double drive axle, rated loading capacity:16TStandard ratio:5.73 for bad road conditions

 

Drive axle: Double drive axle, rated loading  capacity:16TStandard ratio:5.73 for bad road conditions
Tire: 15.5R20 radial  tire, 6 pcs, with one spare tire

 

Tire: 12R 22.5 Radial Tire, 6 pcs. with one spare off-road type
Transmission : HW19710, SINOTRUK 10 forward & 2 reverse

 

 

Transmission : 12 forward & 2 reverse

Engine: WD615.47, 371HP, Euro II emission standard

 

Engine: Euro II emission standard
Engine Displacement: 9.726

 

Engine Displacement: 10.338L
Horsepower (HP): 371

 

Horsepower (HP): 375

 

To Delete in the Technical Specifications:

Delete:

Chasis:
Front axle: STR, steel front steering drive axle with planetary wheel reduction 90 km/h

 

Standard ratio:5.73 for bad road conditions Reinforced diaohragm clutch

 

 

Amendments in the Delivery Period:

Change from: Change to:
Delivery Period: 30 days upon receipt of NTP

 

Delivery Period: 60 days upon receipt of NTP

 

Bidders are enjoined to take note and consider the above mentioned amendments in the technical specifications and delivery period in the preparation of their bids.

 

For the information and guidance of all concerned.

 

            Issued this 8th day of May, 2024.

 

ARTHUR FRAN P. TOLCIDAS

BAC Chairman