SUPPLEMENTAL/BID BULLETIN

Addendum No. 2

 

This Bid Bulletin is issued to inform prospective Bidders of some changes and/or modifications introduced by the Bids and Awards Committee for the requirements “Four (4) Lots Construction Materials for use of the Concreting of Municipal Streets, Poblacion, Zamboanguita, Negros Oriental” under Bid No. B-82-2023, ABC: P3,429,173.00, viz:

 

Amendments in the Technical Specifications (estimated unit cost):

Change from: Change to:
   

Qty

Unit of Issue Estimated Unit Cost Item Description
        Lot 4- Various Const. Materials
1 32 bdft. 32 12 – 2″ x 2 “x 8′ Coco Lumber
2 30 bdft. 30 65- 2″ x 3″ x 12′ Coco Lumber
3 3,200 bdft. 3,200 200-2”x8”x10’ Coco Lumber
4 576 bdft. 576 144-2”x2”x12’  Coco Lumber
         Terms & Conditions :
        1. The supplier shall deliver the materials at the project site within 10 working days upon a written advice by the project engineer.
        Estimated Cost:P126,654.00
   

Qty

Unit of Issue Estimated Unit Cost Item Description
        Lot 4- Various Const. Materials
1 32 bdft. 33.00 12 – 2″ x 2 “x 8′ Coco Lumber
2 30 bdft. 33.00 65- 2″ x 3″ x 12′ Coco Lumber
3 3,200 bdft. 33.00 200-2”x8”x10’ Coco Lumber
4 576 bdft. 33.00 144-2”x2”x12’  Coco Lumber
         Terms & Conditions :
        1. The supplier shall deliver the materials at the project site within 10 working days upon a written advice by the project engineer.
        Estimated Cost:P126,654.00

 

Bidders are enjoined to take note and consider the above mentioned changes in the preparation of their bids.

 

For the information and guidance of all concerned.

 

          Issued this 19th day of July, 2023.

 

ARTHUR FRAN P. TOLCIDAS

 BAC Chairman