NOTICE OF NEGOTIATED PROCUREMENT

(Two Failed Biddings)

 

June 26, 2019

TO ALL INTERESTED BIDDERS

 

We are pleased to invite you in our negotiation conference for the project requirements “To hire contractor to provide materials, labor, and equipment for the 1) Construction of Multi-Purpose Building/Evacuation Center, Barangay Poblacion, Sibulan, Negros Oriental ; 2) Additional Appropriation for the Construction of Multi-Purpose Building/Evacuation Center, Barangay Poblacion, Sibulan, Negros Oriental with an ABC of P2,254,000.00, which will be procured by this province thru “NEGOTIATED PROCUREMENT – Two Failed Biddings”, in accordance with the provision of  Section 53.1 of the revised IRR of RA 9184.

 

Please submit ELIGIBILITY DOCUMENTS, TECHNICAL DOCUMENTS and FINANCIAL DOCUMENTS required during the negotiation conference on July 4, 2019 (Thursday) at 10:00 in the morning at the old SP Session Hall, Capitol Dumaguete City.

 

Note:  Proof of payment of bidding documents  – P2,500.00 (Non-refundable)

 

Please be guided accordingly.

 

 

(VERY IMPORTANT: SEALED ENVELOPES CONTAINING THREE SETS OF DOCUMENTS UPON SUBMISSION)

 

Submitted documents without proper tabbing and not book bounded is automatically disqualified.

 

For further inquiry/clarification, please contact the BAC Secretariat at telephone number (035)226-1111(connect to 475 or 477) or 226-3804 or 422-8895.

 

 

Very truly yours,

 

                                      NESTOR R. VILLAFLORES

                                                     BAC Chairperson

 

For BAC Chairperson:

 

                                  __________________________________

                             ATTY. GEOFFREY P. VILLAHERMOSA

                                                   BAC Secretariat Head

 

One (1) Lot Cluster Bidding

2 Infrastructure Projects, viz:

 

  1. To hire contractor to provide materials, labor and equipment for the “Construction of Multi-Purpose Building/Evacuation Center, Barangay Poblacion, Sibulan, Negros Oriental” which includes the following scope of work:
I Scope of Works undertaken by contract 1  
  1 Soil Investigation 1.00 Lot
II Scope of Works undertaken by contract 2  
  1 Mobilization 1.00 Lot
  2 Signages 1.00 Lot
  3 Demolition Works 1.00 Lot
  4 Earth Works 60.00 Cu.m.
  5 Concrete Works 31.00 Cu.m.
  6 Steel Works 5,253.49 Kgs.
  7 Masonry Works 74.00 Sq.m.
  8 Carpentry Works 1.00 Lot
                 Contract Duration: 56 Calendar Days  

ABC:P1,274,000.00

 

  1. To hire contractor to provide materials, labor and equipment for the “Additional Appropriation for the Construction of Multi-Purpose Building/Evacuation Center, Barangay Poblacion, Sibulan, Negros Oriental” which includes the following scope of work:
I Mobilization 1.00 Lot
II Signages 1.00 Lot
III Concrete Works 45.00 Cu.m.
IV Steel Works 3,708.32 Kgs.
V Masonry Works 49.00 Sq.m.
VI Carpentry Works 1.00 Lot
                   Contract Duration: 38 Calendar Day  

ABC:P980,000.00

 

Total ABC:P2,254,000.00

*Negotiated Procurement – 2 Failed Biddings